Samenvatting

The Zeeburg Battery Energy Storage System (BESS) pilot project (2021-2026) evaluated a 240 kW, 336 kWh battery system supplementing a 55 kW grid connection for 8 dual-connector charging stations located at a Park + Ride facility in Amsterdam. This document answers the original research questions and presents some of the lessons learned during the duration of this project.